Advances in Applied Science Research Open Access

  • ISSN: 0976-8610
  • Journal h-index: 57
  • Journal CiteScore: 93.86
  • Average acceptance to publication time (5-7 days)
  • Average article processing time (30-45 days) Less than 5 volumes 30 days
    8 - 9 volumes 40 days
    10 and more volumes 45 days
Reach us +32 25889658

Abstract

Specially structred flow shop scheduling with fuzzy processing time to minimimze the rental cost

Deepak Gupta, Sameer Sharma and Shefali Aggarwal

Scheduling is a enduring process where the existence of real time information frequently forces the review and modification of pre – established schedules. The real world is complex; complexity in the world generally arises from uncertainty. From this prospective, the concept of fuzzy environment is introduced in the theory of scheduling. This paper pertain to a specially structured n-jobs, 2-machines flow shop scheduling in which processing times are described by triangular fuzzy numbers. Further the average high rankings of fuzzy processing time are not random but bear a well defined relationship to one another. The present work is an attempt to develop a new heuristic algorithm, an alternative to the traditional algorithm as proposed by Johnson’s (1954) to find the optimal sequence to minimize the utilization time of machines and hence, their rental cost under specified rental policy.