International Journal of Applied Science - Research and Review Open Access

  • ISSN: 2394-9988
  • Journal h-index: 10
  • Journal CiteScore: 2.27
  • Journal Impact Factor: 1.33
  • Average acceptance to publication time (5-7 days)
  • Average article processing time (30-45 days) Less than 5 volumes 30 days
    8 - 9 volumes 40 days
    10 and more volumes 45 days

Abstract

Optimizing Bicriteria in Flow Shop Production Schedule With String of Disjoint Job Block Criteria

Sameer Sharma

A bicriteria two stage flow shop scheduling is addressed to minimize the makespan and the rental cost of the machines under specified rental policy simultaneously. The processing times, independent setup times of the jobs are associated with their respective probabilities. Further the jobs are processed in a string of disjoint job-blocks. The study gives an optimal schedule rule to optimize the bicriteria through heuristic approach. The two criteria of minimizing the maximum utilization of the machines or rental cost and minimizing the maximum makespan are one of the combinations of our objective function reflecting the performance measure. A computer programme followed by a numerical illustration is given to substantiate the algorithm.