Advances in Applied Science Research Open Access

  • ISSN: 0976-8610
  • Journal h-index: 57
  • Journal CiteScore: 93.86
  • Average acceptance to publication time (5-7 days)
  • Average article processing time (30-45 days) Less than 5 volumes 30 days
    8 - 9 volumes 40 days
    10 and more volumes 45 days
Reach us +32 25889658

Abstract

A New Heuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Associated with Probabilities Including Transportation Time, Job Block Criteria and Job Weightage

Deepak Gupta, Shashi Bala and Payal Singla

The present paper is attempt to develop a new heuristic algorithm, an alternative to the traditional algorithm proposed by Johnson’s (1954) to find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times are associated with probabilities including transportation time and job block criteria. Further jobs are attached with weights to indicate their relative importance. The proposed method is very simple and easy to understand and also provide an important tool for the decision maker. Algorithm is justified by numerical illustration.